Notes:
3/28/2023 11:50:48 AM
Correction in address 1611 w eagle drive suite 107
6/12/2023 2:21:41 PM
1. Comments cover an in-depth look at plans as submitted. However, omission of specific plan comments does not absolve the contractor of the responsibility for ensuring that all construction complies with the 2021 International Codes as adopted by the City of Denton including the 2020 NEC.
2. Minimum backflow protection shall be RPZ installed at point of use for all potential cross connections.
3. Exit and emergency lighting to be installed per 2021 IBC & IFC.
4. Third party inspection required for energy code compliance, with the exception of wall insulation, inspections to be turned in to your inspector prior to final inspection.
5. Signs, Fences, pools, and Irrigation are all to be by separate permit.
6. All grease interceptors are required to install sample well ports including on existing equipment per City of Denton ordinance. ***CONTACT JORDAN WILSON AT 940-349-8610 PRIOR TO FIRST PUMP OUT AFTER 90 DAYS IN OPERATION TO PROVIDE SOLID WASTE TO MEASURE BUILDUP TO DETERMINE IF A MORE FREQUENT PUMPING SCHEDULE MAY BE REQUIRED.