Notes:
8/11/2023 12:40:47 PM
1)Ceiling insulation to be min r-42
2)Exterior wall insulation to be min r-13 where insulation is exposed.
3)New A/C ducts must be min r-8.
4)Lumber to be span rated and properly sized in accordance with 2021 IRC.
5)Addition must be wrapped with continuous OSB sheathing or a Wind Bracing plan must be provided prior to framing inspection.
6)Proof of termite treatment must be provided prior to final
7)One set of approved plans must be on job site at all times.
8)Call for inspections, no work shall be concealed before it is inspected.