Notes:
8/10/2023 4:03:00 PM
Site-Specific Comment:
• Public Works Inspections confirms receiving notice of work in TxDOT ROW, within City of Denton limits.
Public Works Inspector Contact:
Gavin Petner
Gavin.Petner@cityofdenton.com
940-208-8606
General Comment:
Adherence to City Standard Specifications, Ordinances, and inspection processes is required for ROW construction within the City of Denton, including but not limited to:
• For work limited to TxDOT ROW, only a ROW Final Inspection is required from the City Public Works Inspector. Request a ROW Final Inspection online from your e-TRAKiT dashboard once work is complete, and prior to the permit expiration date. A link to e-TRAKiT and information on required inspections are available in the ROW permit resources at https://www.cityofdenton.com/937/Right-of-Way-Permits
• It is mandatory to visibly spot city utility lines within 10ft of an excavation or bore prior to commencing work. All underground facilities/bores shall maintain a minimum separation of 24 inches from city utility lines and a minimum depth of 36 inches below top of curb per city code section 25-80, and the street shall be backfilled within 7 days of excavation.
Extension Requests:
• Utility/Contractor may request an extension in writing at least five (5) business days prior to the current permit expiration date by attaching a complete Extension Request form to e-TRAKiT for review (form available online at link above).
Revisions:
• Additional plan review and written acceptance from the City of Denton Public Works Inspections Division will be required prior to proceeding with work beyond the original construction plan and/or traffic control plans. Public Works Inspection will be automatically notified when additional/revised documents are successfully attached in e-TRAKiT for review.